NEW QUESTION # 41
A magnetic pull-off type gauge is a good choice when:
- A. When an intrinsically safe tool is required
- B. Accuracy is not required
- C. When working on non-ferrous metals
- D. Performing an adhesion test
Answer: A
NEW QUESTION # 42
If the specifier does not identify a restriction level in accordance with SSPC PA 2, the default restriction level is:
- A. Level 3
- B. Level 4
- C. Level 1
- D. Level 2
Answer: A
NEW QUESTION # 43
To be of value the Inspector's documentation must be:
- A. Submitted before the end of the job
- B. Always typewritten
- C. Timely, accurate and concise
- D. Always handwritten
Answer: C
NEW QUESTION # 44
When performing tests for oil and grease using an ultra-violet light, the NACE Inspector should be aware that:
- A. Chloride salt may produce a false positive
- B. Ultra-Violet light may contaminant the surface
- C. Presence of weld spatter may produce a false positive
- D. Synthetic oil or grease may not be identified
Answer: D
NEW QUESTION # 45
Removal of welds splatter is required:
- A. When ISO abrasive blast standards are specified
- B. When specifically identified in the owner's specification
- C. On every job
- D. When NACE/SSPC abrasive blast standards are specified
Answer: B
NEW QUESTION # 46
Which one of the following documents is the best source for coating technical data:
- A. Safety Data Sheet;
- B. Specification
- C. Technical Data Sheet
- D. Application Guidelines
Answer: C
NEW QUESTION # 47
What is used to determine compressed air cleanliness?
- A. Blotter test
- B. Needle pressure gauge
- C. Profilometer
- D. Psychrometer
Answer: C
NEW QUESTION # 48
Daily reports are important because:
Select All That Apply
- A. Inspectors rarely change on a project.
- B. Management uses them to make personnel decisions.
- C. The information aids communication with supervisors.
- D. the information impacts future projects.
Answer: B,C,D
NEW QUESTION # 49
The Inspector should record the serial numbers of inspection instruments:
- A. Only when verifying accuracy of the instrument
- B. Each time the instrument is used
- C. Only if the instrument is suspected of not working properly
- D. Only if the specification requires it
Answer: B
NEW QUESTION # 50
NACE No. 4/SSPC-SP-7 is a joint standard for
- A. commercial blast cleaning.
- B. brush-off blast cleaning.
- C. white metal blast cleaning.
- D. near-white metal blast cleaning.
Answer: B
NEW QUESTION # 51
Conventional spray is a good choice when:
- A. High viscosity coatings are being applied
- B. High production rates are required
- C. High quality finishes are required
- D. High transfer efficiency is required
Answer: C
NEW QUESTION # 52
A successful coating inspector must be able to
- A. recommend the appropriate coating technique for the job to the contractor.
- B. look for problems or issues during application.
- C. advise the coating applicator on how to mix the coating.
- D. apply the coating with expert accuracy.
Answer: B
NEW QUESTION # 53
Passivation can best be described as:
- A. Complete elimination pf the corrosion process
- B. A coating layer applied to the surface to inhibit corrosion
- C. Treating metal with a liquid inhibiter
- D. A protective metallic oxide surface layer that slows corrosion
Answer: D
NEW QUESTION # 54
If the project specification DOES NOT state the specific DFT measurement standards, the inspector should use
- A. a recognized industry standard like SSPC-PA 2 that is broadly accepted
- B. their best judgment based on similar projects and specifications.
- C. a detailed checklist and document the lack of a standard.
- D. NACE 2/SSPC SP10
Answer: A
NEW QUESTION # 55
NACE SP 0178 is a standard for:
- A. Tanks and Vessels to, be Lined for Immersion Service
- B. Tanks and Vessels to be Externally Coated
- C. Structural steel to be coated for Atmospheric Service
- D. Stainless steel pipe to be Externally Coated
Answer: A
NEW QUESTION # 56
Prior to the pre-job conference you notice that the Inspection and Test Plan does not require a hold point after surface preparation and coating application. In speaking with the owners' representative in advance of the meeting you sense he/she does not understand the importance of the hold point.
As a NACE CIP Level 1 Inspector your preferred course of action is to:
- A. Default to the owner's Inspection and Test Plan
- B. Bring the matter up at the pre-job conference
- C. Meet separately with the coating manufactures' representative and coating application company in advance of the pre-job conference
- D. Gather data and attempt to meet with the owner's representative in advance of the pre-job conference
Answer: B
NEW QUESTION # 57
Surface profile describes:
- A. The level of surface cleanliness required after abrasive blasting
- B. The general condition of the surface required after abrasive blasting
- C. The level of surface roughness required after abrasive blasting
- D. The initial condition of the surface prior to abrasive blasting
Answer: C
NEW QUESTION # 58
ASTM Standards are applicable:
- A. In the USA
- B. In Asia
- C. In North America
- D. When specified
Answer: D
NEW QUESTION # 59
The primary difference between Non-Convertible vs. Convertible coatings is:
- A. Non-convertible coatings do not undergo a chemical change during curing whereas Convertible coatings do
- B. Convertible coatings do not undergo a chemical change during curing whereas Non-Convertible coatings do
- C. Convertible coatings cure solely by solvent evaporation whereas Non-Convertible coatings do not
- D. Non-Convertible coatings cure by co-reaction whereas Convertible coatings do not
Answer: A
NEW QUESTION # 60
If a Thermoset coating is heated it will:
- A. Soften when heated and retain its softness when cooled
- B. Soften when heated and return to its original hardness when cooled
- C. Harden and retain its hardness when cooled
- D. Harden and return to its original hardness when cooled
Answer: C
NEW QUESTION # 61
On a blast-cleaned surface, Ian ultraviolet light is generally used to detect
- A. grease and oil
- B. inhibitor residues
- C. soluble chemical salts
- D. sulfates
Answer: A
NEW QUESTION # 62
Due to a previous premature coating failure the owner has required the original coating applicator to return to remove and replace 10,000 square feet of a failed three coat system at the applicator's cost. Due to the financial implications of another failure, the owner has offered you the job as the NACE CIP Level 1 Coating Inspector and explained that he expects you to be his "insurance policy" for this job. You have never been involved in a warranty job before and are unfamiliar with the coating system.
Your preferred FIRST course of action is to:
- A. Meet with the owner and explain your limitations and concerns prior accepting the assignment
- B. Review the Product Data Sheets, and conduct a walk thru of the job site prior to the pre-job Conference
- C. Review the Product Data Sheets and meet with the Coating Applicator 'prior to the pre-job meeting
- D. Purchase Professional Liability Insurance prior to job commencement
Answer: B
NEW QUESTION # 63
......
NACE-CIP1-001 exam is an essential certification for individuals who work in the coating inspection industry. It demonstrates a high level of competency, knowledge, and skills in coating inspection, and is recognized globally. NACE-CIP1-001 exam covers various topics and has a passing score of 70%. Coating Inspector Level 1 certification is valid for five years and individuals must recertify to maintain their certification status.
Latest NACE-CIP1-001 Pass Guaranteed Exam Dumps with Accurate & Updated Questions: https://www.prepawaypdf.com/NACE/NACE-CIP1-001-practice-exam-dumps.html
Pass NACE-CIP1-001 Exam with Updated NACE-CIP1-001 Exam Dumps PDF 2025: https://drive.google.com/open?id=1QjumPFQVUw7-yAGvqzZJ3TA5VroLENPt