
Scaled Agile SAFe-SPC Dumps - The Sure Way To Pass Exam
SAFe-SPC Exam Questions (Updated 2024) 100% Real Question Answers
NEW QUESTION # 60
(Select 2) What are the 2 biggest reasons to reduce batch size?
- A. Increase delivery reliability.
- B. Produce less measurement overhead.
- C. Decrease stress on the system.
- D. Increase throughput.
- E. Make it easier to assess the state of smaller batches.
Answer: A,D
NEW QUESTION # 61
What role would a traditional program manager most likely take on in SAFe?
- A. Release Train Engineer or Value Stream Engineer.
- B. Business Owner
- C. Scrum master
- D. Product Manager
Answer: A
NEW QUESTION # 62
(Select 2) What would you examine when identifying Value Streams in an enterprise moving to SAFe?
- A. The project cost accounting procedures in place.
- B. The internal departments which are supported.
- C. The number of ARTs which would be contained in the Portfolio.
- D. The current products which the company sells.
Answer: B,D
NEW QUESTION # 63
What concept is NOT on of the Core Value of SAFe?
- A. Program execution
- B. Built-in Quality
- C. Predictability
- D. Alignment
- E. Transparency
Answer: C
NEW QUESTION # 64
Velocity is a good measure of team performance.
- A. True
- B. False
Answer: B
NEW QUESTION # 65
Cultural change must come before you start a SAFe implementation.
- A. True
- B. False
Answer: B
NEW QUESTION # 66
Enabler Features can contribute to the Architectural Runway and realize system Nonfunctional Requirements
at the same time.
- A. False
- B. True
Answer: B
NEW QUESTION # 67
(Select 3) What are the primary reasons to limit WIP?
- A. Decrease wait times
- B. Make it easier to visualize the important work
- C. Increase throughput
- D. Expand context switching
- E. Reduce multiplexing
Answer: A,C,E
NEW QUESTION # 68
What is NOT the responsibility of the Enterprise Architect?
- A. Drive the strategy for maintaining the Enterprise's architecture.
- B. Synchronize the technology stack and infrastructure across Value Streams.
- C. Facilitate reuse of ideas and proven design patterns.
- D. Define the Solution design for Agile Release Trains.
Answer: D
NEW QUESTION # 69
What does the SAFe budgeting model suggest?
- A. Each team gets budget allocation and Features are funded according to their size in normalized Story points.
- B. Each Value Stream receives budget allocation as a whole; individual work is not specifically budgeted.
- C. Each Strategic Theme receives a budget allocation when Strategic Themes span portfolios.
- D. Epics, Features, and Stories are funded based on their size in normalized Story points, while teams are
allocated to high-priority work as needed.
Answer: B
NEW QUESTION # 70
(Select 4) Lean-Agile Leaders ______________.
- A. Run successful Agile Release Trains.
- B. Lead the teams
- C. Embrace the values of Lean.
- D. Facilitate relentless improvement
- E. Manage the most critical day-to-day activities of team members.
- F. Proactively eliminate impediments.
Answer: B,C,D,F
NEW QUESTION # 71
(Select 2) What factors favor centralized decision-making?
- A. Appropriate authority level of the decision maker.
- B. Infrequent decisions.
- C. High cost of delay
- D. Need for fast decision-making.
- E. Economies of scale
Answer: B,E
NEW QUESTION # 72
Backlogs in SAFe behave just like queues.
- A. True
- B. False
Answer: B
NEW QUESTION # 73
What is the ideal size of an ART?
- A. 25 practitioners.
- B. 50-125 practitioners.
- C. 25-50 practitioners.
- D. Whatever the Value Stream requires.
- E. 126-200 practitioners.
Answer: B
NEW QUESTION # 74
(Select 2) Why is Architectural Runway important?
- A. It provides the documentation on which Features and Capabilities are built.
- B. It iteratively evolves the architecture to meet changing needs.
- C. It supports a stable velocity.
- D. It allows for nontechnical changes
Answer: B,C
NEW QUESTION # 75
Backlog items in an Expedite class of service can break WIP limits.
- A. False
- B. True
Answer: B
NEW QUESTION # 76
(Select 3) Based on the work of Don Reinertsen, SAFe denotes five primary economic factors that can be used
to consider the economic perspective of a particular investment. From the list below, choose three of those
primary economic factors.
- A. Development expense
- B. Value stream budget
- C. Return on Investment (ROI)
- D. Risk
- E. Lead time
Answer: A,D,E
NEW QUESTION # 77
(select 3) What are the 3 primary outputs of PI Planning?
- A. Program board
- B. Portfolio Vision
- C. Team PI Objectives
- D. Iteration Goals
- E. Vote of confidence/commitment
- F. Top 10 Features
Answer: A,C,E
NEW QUESTION # 78
What is NOT a good Definition of Done (DoD)?
- A. The Customer is satisfied with the User Experience.
- B. All unit tests are passing.
- C. Coding standards have been followed.
- D. No must-fix defects exist.
- E. Code is checked in and merged into main branch.
- F. Nonfunctional Requirements are met.
Answer: A
NEW QUESTION # 79
......
Pass Scaled Agile SAFe-SPC Exam Quickly With PrepAwayPDF: https://www.prepawaypdf.com/Scaled-Agile/SAFe-SPC-practice-exam-dumps.html
Prepare SAFe-SPC Question Answers - SAFe-SPC Exam Dumps: https://drive.google.com/open?id=1Hewqz-qdvdAKW6VHBojnVTFn-gyDXnRD