HP HPE0-S59 Dumps Questions [2024] Pass for HPE0-S59 Exam [Q20-Q40]

Share

HP HPE0-S59 Dumps Questions [2024] Pass for HPE0-S59 Exam

Updated HP Study Guide HPE0-S59 Dumps Questions


HP HPE0-S59 exam comprises of 60 multiple-choice questions that the candidates need to complete in 105 minutes. HPE0-S59 exam covers a broad range of topics such as HPE ProLiant and BladeSystem server architectures, HPE storage solutions, and HPE OneView management software. HPE0-S59 exam is available in six different languages, including English, Japanese, French, German, Simplified Chinese, and Latin American Spanish, making it accessible to a wide range of professionals around the globe.


Passing the HP HPE0-S59 exam will demonstrate that the candidate has the skills and knowledge necessary to design, deploy, and manage compute solutions based on Hewlett Packard Enterprise products and technologies. HPE Compute Solutions certification can help professionals advance their careers and demonstrate their expertise in compute solutions to employers and clients. HPE Compute Solutions certification also provides access to the benefits of the Hewlett Packard Enterprise certification program, including access to exclusive webinars, training resources, and forums.


HPE0-S59 (HPE Compute Solutions) Certification Exam is a professional certification exam designed for IT professionals who want to validate their knowledge and skills in designing, deploying, and managing HPE compute solutions. HPE Compute Solutions certification exam is offered by Hewlett Packard Enterprise (HPE), a leading technology company that provides IT infrastructure, software, and services to businesses and organizations worldwide. The HPE0-S59 exam covers a wide range of topics related to HPE compute solutions, including server architecture, storage solutions, networking, virtualization, and security.

 

NEW QUESTION # 20
You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group What should you check to fix the issue?

  • A. If the logical enclosure is built on at least three HPE Synergy frames
  • B. if both FiexNICs are configured with the same speed
  • C. if both FiexNICs are connected to different networks
  • D. if the logical enclosure is configured with redundant master modules

Answer: B


NEW QUESTION # 21
Your customer has an HPE Synergy frame equipped with a D3940 Storage Module. Each of the compute nodes has an appropriate storage controller Installed and two 12Gb SAS switches installed in the first fabric.
The customer reports that compute nodes cannot access the storage module. What should you verify first when troubleshooting this problem?

  • A. If there Is a logical interconnect created based on the 12Gb SAS switches.
  • B. If the D3940 storage module is property licensed through HPE OneView interface.
  • C. If the D3940 module is imported in managed state that allows volume provisioning.
  • D. If there is at least one ISCSI network configured that will provide access to the module.

Answer: C


NEW QUESTION # 22
Your customer has me following HPE Synergy setup
- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure
- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy
- Four HPE Synergy 50Gb interconnect Link Module
- Six HPE Synergy Virtual Connect SE 32Gb FC Modules
The customer needs to add a frame.
Which statement about the expansion of this setup is true?

  • A. The customer has to create a new logical enclosure for the additional frame
  • B. The additional frame cannot have 12Gb SAS connection modules installed
  • C. The additional frame must have HPE Virtual Connect FC modules installed
  • D. The customer can grow the existing logical enclosure up to 5 frames

Answer: A


NEW QUESTION # 23
Which statement about the SY480 Gen10 Plus Compute Module is true?

  • A. It cannot be mixed with Gen9 compute modules in the same frame.
  • B. It supports 8 memory channels and memory DIMMs of up to 256GB.
  • C. It supports "3rd Gen AMO EPYC Server Processors with 64 cores.
  • D. It only supports NVDIMM Persistent Memory.

Answer: D


NEW QUESTION # 24
Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options - SAS connectivity installed in the first fabric - FC connectivity Installed In the second fabric - Ethernet connectivity installed in the third fabric.
Which statement regarding this setup is true?

  • A. Each compute node must have at least 768GB of memory installed
  • B. Compute nodes must have a second CPU installed to access the second fabric.
  • C. Each interconnect module in each fabric must be properly licensed in HPE OneView
  • D. Interconnect modules that provide SAS connectivity should be moved to the third fabric

Answer: A


NEW QUESTION # 25
Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.
Which HPE compute system meets this customer's requirements?

  • A. HPE ProLiant DL380 Gen 10 Plus
  • B. HPE Superdome Flex 280
  • C. HPE ProLiant DL560 Gen10
  • D. HPE Synergy 480 Gen10 Plus

Answer: A


NEW QUESTION # 26
Which tool can be used to evaluate me health of an HPE Oneview appliance before proceeding with an appliance updated.

  • A. HPE OneView Update Readiness Checker
  • B. HPE OneView Global Dashboard
  • C. HPE OneView Firmware Compliance Report
  • D. HPE Composer Maintenance Console

Answer: D


NEW QUESTION # 27
You need to configure a RoCE network to enable lossless networking for HPE J2000 Flash Enclosure support Which interconnects are required to support this connection? (Select two.)

  • A. HPE Virtual Connect SE 32Gb FC Module for HPE Synergy
  • B. HPE Virtual Connect SE 100Gb F32 Module for HPE Synergy
  • C. Brocade 16Gb Fibfe Channel SAN Switch Module for HPE Synergy
  • D. HPE Virtual Connect SE 40Gb F8 Module for HPE Synergy
  • E. HPE Virtual Connect SE 16Gb FC Module for HPE Synergy
  • F. Brocade 32Gb Fibre Channel SAN Switch Module for HPE Synergy

Answer: A,E


NEW QUESTION # 28
Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer's needs?

  • A. At least Tour HPE Persistent Memory DIMMs per nPar
  • B. One base chassis and three expansion chassis with licenses
  • C. HPE Superdome Flex Grid licenses enabling connectivity between chassis
  • D. Rack Management Controller for nPar management

Answer: B


NEW QUESTION # 29
Your customer plans to deploy ESXi systems to HPE Synergy and HPE ProLiant servers using HPE OneView for VMware vCenter Server.
Which statement about HPE OneView for VMware vCenter Server functionality is true for this environment?

  • A. HPE Synergy requires HPE Composer 2 for full functionality of HPE OneView for VMware vCenter Server
  • B. Individual systems can be added to HPE OneView for VMware vCenter Server through an ILO management processor
  • C. HPE ProLiant servers need an HPE OneView for VMware vCenter Server license for full functionality
  • D. Only systems managed using HPE Oneview can use HPE Oneview for VMware vCenter Server functionalities

Answer: C


NEW QUESTION # 30
Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.
What should you do to resolve this issue?

  • A. Install and configure MPIO on me Windows system
  • B. Remove the offline disks using array management tools
  • C. Remove the offline disks using Windows Disk Management
  • D. Disable deduplication for this volume at the array level

Answer: A


NEW QUESTION # 31
An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays Where should you start the troubleshooting process?

  • A. At HPE OneView Interface to verify whether the server is In the maintenance mode
  • B. At HPE OneView Interface to verify whether the iLO processor is disabled
  • C. At the iLO interface to verify whether the SSO certificate is removed from an iLO.
  • D. At the iLO interface to verify whether the ILO Advanced license is properly applied

Answer: D


NEW QUESTION # 32
Refer to the exhibit.

Which statement about this logical JBOD is true?

  • A. After deleting this logical JBOD, its drives w not be available until a clean-up procedure 6 done
  • B. This logical JBOD can be connected to multiple systems to formulate a snared datastore.
  • C. This logical JBOD can be presented to the compute nodes in a different frame.
  • D. After deleting this logical JBOD drives will he blocked for 12h m case this JBOD must be re-created

Answer: A


NEW QUESTION # 33
Your customer reports that they cannot deploy HPE Synergy compute nodes using HPE OneView for VMware vCenter Server (HPE OV4VC).
What should you check during troubleshooting process?

  • A. If an compute nodes are added to the vCenter Server
  • B. If the HPE Oneview instance Is integrated with HPE OV4VC.
  • C. If HPE OneView credentials are added in vCenter Server
  • D. If vCenter Server is licensed in the HPE Oneview interface

Answer: A


NEW QUESTION # 34
Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.
Which statement about mixing different FLM modules is true?

  • A. A management ring with mixed FLM modules cannot have more than 12 frames
  • B. A management ring can contain mixed frame link module configurations
  • C. Existing 2-port FLM modules must be replaced with 4-port FLM modules
  • D. Mixing different FLM modules is allowed if all of them have the same firmware version

Answer: A


NEW QUESTION # 35
Your customer plans to use HPE OneView for VMware vCenter Server to deploy ESXi systems. They created a server profile template that they want to use in HPE OneView.
Put the steps required to configure HPE OneView for VMware vCenter Server on the left into their correct order on the right.

Answer:

Explanation:


NEW QUESTION # 36
An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement

Answer:

Explanation:


NEW QUESTION # 37
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard licenses for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options Which statement about this proposal is true?

  • A. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
  • B. 2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup
  • C. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.
  • D. vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features

Answer: D


NEW QUESTION # 38
Which HPE Virtual Connect feature allows an administrator to suppress excessive inbound multicast broadcast and destination lookup failure (OLF) packets?

  • A. Storm control
  • B. Pause flood protection
  • C. LLDP tagging
  • D. Loop protection

Answer: A


NEW QUESTION # 39
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives The customer requested the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- An appropriate number of vSAN Standard licenses for each compute node
- One HPE O3940 Storage Module with 40 SSDs - All required cables and options Which statement about this request is true?

  • A. vSphere Standard licenses should be replaced with Enterprise Plus licenses to enable vSAN
  • B. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
  • C. vSphere licenses should be added, as vSAN licenses do not replace vSphere licenses
  • D. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drives.

Answer: A


NEW QUESTION # 40
......

Achieve Success in Actual HPE0-S59 Exam HPE0-S59 Exam Dumps: https://www.prepawaypdf.com/HP/HPE0-S59-practice-exam-dumps.html

Valid HPE0-S59 exam with HP Real Exam Questions: https://drive.google.com/open?id=1QdzVC8wfpD2eC7hmozr3fg0A-dFZxvDf