H35-912-ENU Dumps PDF - H35-912-ENU Real Exam Questions Answers [Q76-Q91]

Share

H35-912-ENU Dumps PDF - H35-912-ENU Real Exam Questions Answers

Get Started: H35-912-ENU Exam [2021] Dumps Huawei PDF Questions

NEW QUESTION 76
Which are the correct statements about the cabinet? (Multiple choice)

  • A. IEC cabinet supports 21-inch equipment
  • B. ETSI cabinet supports 19-inch equipment
  • C. IEC cabinet supports 19-inch equipment
  • D. ETSI cabinet supports 21-inch equipment

Answer: C,D

 

NEW QUESTION 77
Which of the following methods does not power on the server?

  • A. Power on the server through the interface provided by the iBMC web interface.
  • B. Power on the server by pressing the UID button on the front panel
  • C. Power on the server through the iBMC command line.
  • D. Power on the server by pressing the front panel power switch button

Answer: B

 

NEW QUESTION 78
The signal cable can be placed on the heat dissipation mesh of the cabinet.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 79
Operation of electrical equipment must be authorized, qualified and competent.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 80
What should be prepared for the preparation of first aid?

  • A. Emergency rescue phone number, emergency location and map
  • B. Office location
  • C. Home address

Answer: A

 

NEW QUESTION 81
When the MA5800 uplink fiber connection is connected, which statements are correct? (Multiple Choice)

  • A. Upstream adopts SC type fiber
  • B. One end is connected to the uplink port, and the other end is connected to the corresponding optical port of the ODF frame.
  • C. Fiber needs to be tied
  • D. The fiber needs to be placed in the bellows at the top of the cabinet.

Answer: B,C,D

 

NEW QUESTION 82
Which are the correct statements in the SOP interpretation of the MA5800? (Multiple choice)

  • A. The transmission equipment in engine room does not need to be installed.
  • B. The DC power supply system of the engine room must have been installed to provide a stable power supply.
  • C. The installation scenario must be clear: cement floor installation or anti-static floor installation, etc.
  • D. Workers need to wear safety helmets and anti-shoes when entering the station.

Answer: B,C,D

 

NEW QUESTION 83
Which of the following statements is correct. when the MA5800 downlink fiber connection? (Multiple choice)

  • A. One end is connected to the main control board, and the other end is connected to the ODF frame.
  • B. Downstream adopts SC type fiber
  • C. Fiber needs to be tied
  • D. When the fiber is laid at the inflection point, pay attention to the need to bend, cannot be folded into 90 degrees

Answer: B,C,D

 

NEW QUESTION 84
Which of the following statements about the development of the access network is correct?

  • A. First voice (narrowband) access, followed by broadband access, followed by FITx optical access
  • B. First, broadband services emerged, and then narrowband voice services were born.
  • C. First, optical access occurs, and then the copper access network appears.

Answer: A

 

NEW QUESTION 85
When powering off the running framed communication equipment cabinet, first cut off the power distribution switch of the cabinet.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 86
Which of the following does the safety accident work focus on?

  • A. Immediate emergency response
  • B. Prevention
  • C. Notification after processing
  • D. Timely notification

Answer: B

 

NEW QUESTION 87
What are the requirements for construction in hazardous areas? (Multiple choice)

  • A. Provide appropriate safety protection for personnel in hazardous area construction, using special safe working tools
  • B. In the construction of hazardous areas, emergency measures and safety measures must be taken
  • C. Erection of warning signs and enclosure isolation measures

Answer: A,B,C

 

NEW QUESTION 88
In the process of replacing the signal cable and the power cable, the cable connection can be directly implemented according to the cable label. It is not necessary to perform the line sequence check according to the cable route.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 89
Regarding the MA5800 frame device, the signal cable hardware quality standard, which statements are correct? (Multiple Choice)

  • A. Signal cable can be damaged, broken, intermediate connector
  • B. The signal cable plug is clean and undamaged, the plug made in the field is correctly standardized, and the plug connection is correct and reliable.
  • C. The signal cable route is consistent with the engineering design file, which is convenient for maintenance and expansion.
  • D. Signal cable should be tested for continuity on each line

Answer: B,C,D

 

NEW QUESTION 90
Which of the following is the work done during the verification phase after "high-risk operation"?

  • A. Confirmation of project operation completion
  • B. Recording of major operational records
  • C. Network test verification
  • D. Confirm the operation board

Answer: C

 

NEW QUESTION 91
......

H35-912-ENU Premium Exam Engine pdf Download: https://www.prepawaypdf.com/Huawei/H35-912-ENU-practice-exam-dumps.html