To prepare for the SAP C-TS422-2021 exam, candidates can take advantage of various resources such as SAP training courses, self-study materials, and practice exams. C_TS422_2021 exam consists of 80 multiple-choice questions that must be completed in 180 minutes, and a passing score of 65% is required to earn the certification. With the SAP C-TS422-2021 certification, individuals can demonstrate their expertise in SAP S/4HANA Production Planning and Manufacturing and enhance their career opportunities in this field.

 

NEW QUESTION # 42
Which mhetods are available for goods issue posting of material components for process orders?

  • A. Blackflushing
  • B. Picking list
  • C. Kanban
  • D. Transfer order

Answer: A,B


NEW QUESTION # 43
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
  • B. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • C. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
  • D. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.

Answer: A


NEW QUESTION # 44
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?

  • A. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
  • B. Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
  • C. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
  • D. Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator

Answer: A


NEW QUESTION # 45
What type of time element can be reduced by strategy settings while dispatching?

  • A. Transportation time
  • B. Setup time
  • C. Queue time
  • D. Wait time

Answer: C,D


NEW QUESTION # 46
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?

  • A. Use a specific material group
  • B. Use a specific MRP type
  • C. Use specific MRP controller
  • D. Use a specific material status

Answer: A,C


NEW QUESTION # 47
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements without checking the capacity of a work center.
  • B. MRP creates capacity requirements only if the work center has sufficient capacity.
  • C. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

Answer: A


NEW QUESTION # 48
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  • A. The plant-specific status
  • B. The last restrictive status
  • C. The most restrictive status
  • D. The cross-plant status

Answer: C


NEW QUESTION # 49
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Make-to-order production (20)
  • B. Make-to-stock production (10)
  • C. Planning without final assembly (50)
  • D. Planning with final assembly (40)

Answer: D


NEW QUESTION # 50
What is a work center hierarchy in planning in SAP S/4HANA?

  • A. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
  • B. A group of work centers in a production line being used in sequence for production
  • C. A group of alternative work centers for production, structured in hierarchy levels by priorities
  • D. A group of alternative work centers providing a cumulative available capacity for production.

Answer: D


NEW QUESTION # 51
What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?

  • A. Consumption sequence procedure
  • B. Order type
  • C. Requirements type
  • D. Requirements profile

Answer: C


NEW QUESTION # 52
Why would you use phantom assemblies?

  • A. To simplify the structure of bills of materials
  • B. To reduce the number of material masters
  • C. To reduce the number of changes required in bills of materials
  • D. To increase the number of planning levels
  • E. To make the assignment of components easier

Answer: A,C,E


NEW QUESTION # 53
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

  • A. Planed delivery time
  • B. Operation duration
  • C. In-house production time
  • D. Total replenishment lead time

Answer: A,C


NEW QUESTION # 54
When do you use variant bills of materials (BOMs)?

  • A. When a material has multiple BOMs
  • B. When a material has a configurable BOM
  • C. When multiple materials have multiple BOMs
  • D. When multiple materials also have similar BOMs

Answer: C


NEW QUESTION # 55
Which information is required when you created a production master in SAP S/4HANA?

  • A. Product type
  • B. Selective screen for views
  • C. Industry sector
  • D. Base unit of measure

Answer: A,B


NEW QUESTION # 56
Which time elements are relevant for lead time scheduling of a production order?

  • A. Float after production
  • B. Setup time
  • C. Total replenishment lead time
  • D. Planned delivery time

Answer: A,D


NEW QUESTION # 57
In the Schedule Production app which setting can you make for the planning strategy?

  • A. Direction
  • B. Fixed pegging
  • C. Scheduling control
  • D. Fitness level
  • E. Planning mode

Answer: A,C,E


NEW QUESTION # 58
Which SAP application can be used for forcasting in Supply Chain Planning?

  • A. Material Requirements Planning (MRP)
  • B. Integrated Business Planning (IBP)
  • C. Capacity Requirements Planning (CRP)
  • D. Supply Chain Management(SCM)

Answer: B,D


NEW QUESTION # 59
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

  • A. Plants parameters
  • B. MRP profile
  • C. MRP group
  • D. MRP controller

Answer: C


NEW QUESTION # 60
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

  • A. Demand Planning (DP)
  • B. Material Requirements Planning (MRP)
  • C. Supply Network Planning (SNP)
  • D. Capacity Requirements Planning (CRP)

Answer: B


NEW QUESTION # 61
......


SAP C_TS422_2021 certification is a valuable certification for professionals who work in the field of production planning and manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification validates the candidate's knowledge and skills related to the SAP S/4HANA Production Planning and Manufacturing module. To prepare for the exam, candidates can enroll in training courses, access online resources, and take practice exams. Passing the SAP C_TS422_2021 certification exam can enhance the candidate's career prospects and increase their earning potential.

 

LATEST C_TS422_2021 Exam Practice Material: https://www.prepawaypdf.com/SAP/C_TS422_2021-practice-exam-dumps.html

New C_TS422_2021 Actual Exam Dumps,  SAP Practice Test: https://drive.google.com/open?id=1pqWEwZsvUeDr1pKgWwo3YU3k7T27t10p